Sijabat, W., Siregar, S. and Siregar, B. (2024) “DAMPAK PANDEMI COVID-19 TERHADAP PELAKSANAAN PROYEK EPC PLTM PARMONANGAN II “ 2X5 MW TAPANULI UTARA”, Jurnal Insinyur Profesional, 4(1). doi: 10.24114/jip.v3i2.37703.